← All guides

How Is the Fake CEO Drill Scored?

Published November 14, 2026 · Reviewed November 14, 2026 · By the Ingenious AI team

The short answer

Out of 100, in three legs that mirror the ceremony itself. Putting the instruction on hold immediately earns 40 — the largest share, because an unheld payment can be lost while you deliberate. Performing the out-of-band callback to the known-good number earns 30. Completing dual approval on separate devices earns 30. There are no points for spotting that the message 'looked fake': the drill grades the process, not the team's detective instincts, because in production the message may look perfect. A team that holds, calls, and dual-approves scores 100 against any script, including the ones nobody has written yet. Run the scenario for real with the drill guide.

Try the free check

What is drill scoring?

Drill scoring is the rubric WireWatch applies to a simulated fraud walk-through: a deterministic 100-point split across the ceremony's three legs — hold (40), callback (30), dual approval (30) — produced by the same scoring function whether the team is practising or reviewing. Like the risk engine, it is fixed and published, so a score means the same thing in every team and every quarter.

Why the hold is worth 40

Because it is the only leg that, by itself, guarantees the money survives the day. A held instruction can be verified at leisure; an unheld one races the team's doubts against the bank's settlement speed. The drill therefore pays its largest reward for the fastest, simplest act: stop the payment first, deliberate second. Teams sometimes feel the hold is 'automatic' once the instruction is logged — the score comes from the engine — but the human decision to log it instead of acting on it, replying to it, or preparing the payment 'in parallel' is exactly what is being graded.

The corollary stings productively: a team that performs a beautiful callback on an instruction it never held scores at most 60, and in production would likely score a loss. Sequence is substance.

The callback's 30, and how they are lost

The callback points require the real ceremony step: a call placed by the team, to the known-good number from the records, with the confirmation recorded. The classic deductions map to the classic failures. Replying in-thread instead of calling: the leg is simply absent. Calling a number supplied by the message: the call happened, but to the attacker — in the drill's terms the confirmation is worthless and the leg fails. Calling the right number but recording nothing: partial process, no evidence, and in production nothing for the second approver to stand on.

Notice the drill is grading provenance again. The same theme runs through the whole product — masters, contacts, verified sets — and the drill is where the team feels it: the identical phone call earns 30 or 0 depending on which number was dialled.

Dual approval's 30: the leg teams try to waive

The final leg requires two distinct approvers on distinct devices completing the gate. Drill losses here are social: the second approver 'trusts the first's judgment' and approves without the callback record; the pair shares a device in the room for convenience; the 'executive' character pressures the second approver directly and they fold. Each is a rehearsal of a real production failure, discovered at rehearsal prices.

A subtle scoring truth: in the drill, dual approval completed on a fraudulent instruction is not the goal — the goal is the gate functioning, which includes the second approver rejecting where the callback failed. The rubric credits the ceremony's completion: verification done, two people deciding, the decision — approve or reject — following the evidence.

Reading common scores

100: the boring perfect — hold, call, decide. The team's job is to keep it boring across staff changes. 70: usually hold + callback with the approval leg rushed, or hold + approval with the callback replaced by an in-thread exchange — the profile of a team that trusts its people more than its process. 40: hold only; the team stopped the money and then improvised, which saves the day and fails the system. Below 40: the payment was prepared or 'processed in parallel' — the drill has found the exact hole the real attack would use, at the cheapest possible price.

Track scores across runs rather than worshipping one number. The trend is the metric an insurer or a board actually cares about: is this team's ceremony strengthening, and which leg is this quarter's work?

From score to fix in one meeting

End every drill by converting lost points into named fixes with owners and dates: the callback number missing from records becomes a master update; the deputy approver gap becomes an enrolment; the in-thread reply habit becomes one line in the policy. Then rerun the same scenario within a month — the rubric's determinism makes the improvement legible, and a team that watches its own 40 become 100 owns the ceremony in a way no training video achieves.

That ownership is the drill programme's real output. The score is a mirror; the fixes are the progress; and the ledger of drill results joins the insurer evidence a practised team can produce on request.

The 5-action scoring debrief

  1. Award the hold honestly: was the instruction logged and held before any reply, preparation, or parallel processing?
  2. Audit the callback's number: records or message? The provenance decides the leg, not the conversation's warmth.
  3. Check the approval pair: two distinct people, two distinct devices, deciding from the callback record — not from trust.
  4. Name the lost points' step in one sentence each; vague lessons ('be more careful') earn no rerun improvement.
  5. Assign fixes with owners and rerun within a month to prove the score moved.

Worked example: a fictional firm's 70, dissected

Example — fictional, for illustration. At fictional Northbeam Logistics, the voice-call drill ends with a score of 70. The hold earns its 40: the assistant logs the 'director's' demand and it holds at once. The callback earns its 30: she calls the director's recorded mobile, reaches the real director, and the fraud is confirmed. The approval leg earns nothing: earlier in the exercise, before the callback, the second approver had already tapped approve 'to keep things moving', reasoning he could withdraw it if needed — in WireWatch he could not have; an approval beside a later reject blocks, but an approval given blind taught the room the wrong reflex.

The debrief's single fix: approvals are read from the callback record, never given in advance. The rerun scores 100, and the story becomes the firm's onboarding tale for new finance staff. Before: 70, with the failure hiding in the leg everyone assumed was clerical. After: the rubric exposed that approvals are judgments, and the team's judgments now wait for evidence.

Related guides and the standing invitation

Companion reading for this topic: How Do You Run a Payment Verification Drill? · You Got a Fake CEO WhatsApp Message: What Do You Do? · What Is CEO Fraud? · What Is an Insurer Evidence Export for Payment Controls?.

Whatever this guide led you to check, prove it the way every guide in this series ends: run the free check on the instruction in front of you, read how the ceremony works for the normative version, and see plans if you want the ceremony enforced on every payment instead of one. A verification you have not recorded is a hope, not a control.

Check an instruction — free · All guides · Create a free account

Sources

Frequently asked questions

Can a drill score be negative or partial within a leg?

The rubric is three clean legs — 40, 30, 30 — awarded for the hold, the performed callback, and the completed dual approval. Debriefs can discuss near-misses in words, but the score stays legible: whole legs, honestly awarded.

Why no points for identifying the message as fake?

Because identification is unreliable in production — the next message may be flawless. The drill grades the behaviours that work regardless of how good the fake is.

Does the drill use the same scenarios for every team?

WireWatch ships three: fake CEO WhatsApp, vendor bank-detail change by email, and urgent voice call from 'the bank'. This guide covers the first; the scoring rubric is identical across all three.

What score should a team reach before it is 'ready'?

A repeat 100 across scenarios and staff rotations. Readiness is the pattern, not a single run — which is why drills recur quarterly and after team changes.

Who sees drill scores?

Your team, in the product. They also form part of the evidence a Pro-plan team can show an insurer: a practised, scored ceremony is a control with a track record.

Check an instruction — free · The callback ceremony

← Back